[Advance to content]

Highways Agency Reports

By Publisher

2 Reports Published by 'Institute of Road Construction and Maintenance'

Institutional arrangements for commissioning and delivering road research
Institute of Road Construction and Maintenance, 1997

Institutional arrangements for commissioning and delivering road research, Austria
Institute of Road Construction and Maintenance, 1997

372 Additional Reports that may be by 'Institute of Road Construction and Maintenance'

Life cycle costing and durability of bridges
Steel Construction Institute, 1995

Life cycle costing and durability of bridges
Steel Construction Institute, 1995

Support to drafting of parts 2 of EC3 and EC4
Steel Construction Institute, 1994

Reducing the maintenance cost of steel bridges
Steel Construction Institute, 1993

Report to the Department of Transport - support to drafting of parts 2 of EC3 and EC4
Steel Construction Institute, 1993

Report to the department of transport support to drafting of parts 2 of EC3 and EC4. Report on stage 1, to 31.3.93
Steel Construction Institute, 1993

Assessment version of BS 5400 Part 3: report on draft document
Steel Construction Institute, 1992

The behaviour of hogging moment regions of composite bridge and buildings
Steel Construction Institute, 1991

The use of BS 5400: part 3 for the assessment of bridges
Steel Construction Institute, 1991

The use of BS 5400: part 3 for the assessment of bridges
Steel Construction Institute, 1991

B116/5 design studies design of composite bridges final report on comparison of B116/4 and B116/5 crack control requirements
Taunton South Western Road Construction Unit, 1978

Impact of de-icing salt on roadside vegetation: a literature review
Swedish National Road and Transport Research Institute, 1998

Report for Staffordshire County Council on an investigation of fire damage to the Wyrley & Essington Canal/M6 bridge
Derby Construction Materials Testing Limited, 1994

Lawtland House Viaduct investigation into the deterioration of concrete columns
Kirkby Balfour Beatty Power Construction, 1980

M6 motorway survey and investigation of concrete in Roundthwaite Bridge
Vol. 1 Report & photographs
Kirkby Balfour Beatty Power Construction, 1980

M6 motorway survey and investigation of concrete in Roundthwaite Bridge
Vol. 2 Appendices
Kirkby Balfour Beatty Power Construction, 1980

Source control using constructed pervious surfaces
Construction Industry Research and Information Association, 2002

Control of water pollution from construction sites: guidence for consultants and contractors
Construction Industry Research and Information Association, 2001

Managing water sustainably in the built environment: CIRIA Conference
Construction Industry Research and Information Association, 2001

Sustainable urban drainage systems: best practice manual fro England, Scotland, Wales and Northern Ireland.
Construction Industry Research and Information Association, 2001

Bioengineering the Longham Wood cutting field trial prepared under contract to CIRIA by J.R. Greenwood ... [et al.]
London Construction Industry Research and Information Association, 2000

Bridge detailing guide
Construction Industry Research and Information Association, 2000

Contaminated land risk assessment a guide to good practice D.J. Rudland, R.M. Lancefield, P.N. Mayell
London Construction Industry Research and Information Association, 2000

Developing a risk communication tool (RiskCom) report on research methodology HR Wallingford ... [et al.]
London Construction Industry Research and Information Association, 2000

Engineering in Mercia mudstone produced under contract to CIRIA by Maunsell Ltd R.J. Chandler, A. Forster
London Construction Industry Research and Information Association, 2000

Faster construction on site by selection of methods and materials prepared under contract to CIRIA by Ove Arup and Partners Limited A. Delves, R. Drayton, T. Sheehan
London Construction Industry Research and Information Association, 2000

Managing project change a best practice guide D. Lazarus, R. Clifton
London Construction Industry Research and Information Association, 2000

A review of testing for moisture in building elements Michael J. Dill
London Construction Industry Research and Information Association, 1999

Freeze-thaw resisting concrete, its achievement in the UK T.A. Harrison, J.D. Dewar, B.V. Brown
London Construction Industry Research and Information Association, 1999

Permanent formwork in construction by R.G. Wrigley
London Construction Industry Research and Information Association, 1999

Grouting for ground engineering prepared under contract to CIRIA by the Geotechnics and Tunnelling Division W S Atkins Consultants Limited C.G. Rawlings, E.E. Hellawell, W.M. Kilkenny
London Construction Industry Research and Information Association, 1998

Hydraulic measures for the control and treatment of groundwater pollution
Construction Industry Research and Information Association, 1998

Management of gully pots for improved runoff quality
Construction Industry Research and Information Association, 1998

Management of gully pots for improvemed runoff quality
Construction Industry Research and Information Association, 1998

Sustainable urban drainage systems
Construction Industry Research and Information Association, 1998

Sustainable urban drainage systems
Construction Industry Research and Information Association, 1998

Action in the case of nonconformity of concrete structures P.R. Ainsworth, C.J. Hopkins
London Construction Industry Research and Information Association, 1997

Adding value to construction projects through standardisation and and pre-assembly prepard under contract to CIRIA by research team: Laing Technology Group Limited, Ove Arup Research & Development, Loughborough University
London Construction Industry Research and Information Association, 1997

Controlled permeability formwork W.F. Price
London Construction Industry Research and Information Association, 1997

Culvert design Manual
Construction Industry Research and Information Association, 1997

Design of containment systems for the prevention of water pollution from industrial incidents
Construction Industry Research and Information Association, 1997

Inland dredging - guidance on good practice
Construction Industry Research and Information Association, 1997

Management of gully pots for improved runoff quality
Construction Industry Research and Information Association, 1997

Management of gully pots for improved runoff quality prepared under contract to CIRIA by Reid Crowther Consulting Ltd and Imperial Colleg Martin Osborne ... [et al.]
London Construction Industry Research and Information Association, 1997

Review of the design and management of onstructed wetlands
Construction Industry Research and Information Association, 1997

Screeds and floorings a guide to their selection, construction, testing and maintenance prepared under contract to CIRIA by the Laing Technology Group Ltd and the University of Reading M.J. Gatfield
London Construction Industry Research and Information Association, 1997

The observational method in ground engineering principles and applications prepared under contract to CIRIA by Ove Arup and Partners in collaboration with Balfour Beatty Civil Engineering Ltd Duncan Nicholson ... [et al.]
London Construction Industry Research and Information Association, 1997

Use of industrial by-products in road construction - water quality effects
Construction Industry Research and Information Association, 1997

Waste minimisation and recycling in construction technical review prepared under contract to CIRIA by Scott Wilson Kirkpatrick & Co Ltd P.M. Guthrie, S.J. Coventry, A.C. Woolveridge
London Construction Industry Research and Information Association, 1997

Hydraulic design of culverts
Construction Industry Research and Information Association, 1996

Hydraulic measures for the treatment and control of groundwater pollution
Construction Industry Research and Information Association, 1996

Infiltration drainage - hydraulic design
Construction Industry Research and Information Association, 1996

Infiltration drainage - manual of good practice
Construction Industry Research and Information Association, 1996

Small embankment reservoirs: a comprehensive guide to the planning, design, construction and maintenance of small embankment reservoirs for water supply and amenity use
Construction Industry Research and Information Association, 1996

Use of industrial by-products in road construction -b water quality effects
Construction Industry Research and Information Association, 1996

Use of industrial by-products in road construction water quality effects prepared under contract to CIRIA by AEA Technology, Transport Research Laboratory and Green Land Reclamation G. Baldwin ... [et al.]
London Construction Industry Research and Information Association, 1996

ydraulic measures for the treatment and control of groundwater pollution
Construction Industry Research and Information Association, 1996

Infiltration drainage - Case studies of UK practice
Construction Industry Research and Information Association, 1995

Infiltration drainage - appraisal of costs
Construction Industry Research and Information Association, 1995

Infiltration drainage - legal aspects
Construction Industry Research and Information Association, 1995

Infiltration drainage - literature review
Construction Industry Research and Information Association, 1995

Quality management in construction survey of experiences with BS 5750 prepared under contract to CIRIA by Bucknall Austin Plc
London Construction Industry Research and Information Association, 1995

Sediment management in urban drainage catchments
Construction Industry Research and Information Association, 1995

The role of integrity and other non-destructive testing in the evaluation of piled foundations prepared under contract to CIRIA by Michael J. Turner of Turner Geotechnical Associates
London Construction Industry Research and Information Association, 1995

Underground service reservious: waterproofing and repair manual
Construction Industry Research and Information Association, 1995

Care and treatment of steel reinforcement and the protection of starter bars prepared under contract to CIRIA by Arup Research and Development M.N. Bussell, R. Cather
London Construction Industry Research and Information Association, 1994

Control of pollution from highway drainage discharge
Construction Industry Research and Information Association, 1994

Control of pollution from highway drainage discharge
Construction Industry Research and Information Association, 1994

Control of pollution from highway drainage discharges
Construction Industry Research and Information Association, 1994

Design and construction of joints in concrete structures prepared under contract to CIRIA by Arup Research & Development M.N. Bussell, R. Cather
London Construction Industry Research and Information Association, 1994

Design of sewers to control sediment problems
Construction Industry Research and Information Association, 1994

Design of sewers to control sediment problems prepared under contract to CIRIA by Bibbie & Partners in association with HR Wallingford Ltd. and Imperial College J.C. Ackers, D. Butler, R.W.P. May
London Construction Industry Research and Information Association, 1994

Formwork striking times criteria, prediction and methods of assessment prepared under contract to CIRIA by T.A. Harrison
London Construction Industry Research and Information Association, 1994

Foundations in chalk prepared under contract to CIRIA by Ove Arup and Partners J.A. Lord, D. Twine, H. Yeow
London Construction Industry Research and Information Association, 1994

Remedial treatment of contaminated land using in-ground barriers, liners and cover systems prepared under contract to CIRIA by Edmund Nuttall Ltd in association with Rust Environmental Kevin D. Privett, Stephen C. Matthews, Robert A. Hodges
London Construction Industry Research and Information Association, 1994

Risk assessment for methane and other gases from the ground a report in CIRIA's research programme Methane and associated hazards to construction prepared under contract to CIRIA by Ove Arup and Partners in conjunction with DnV Technica N.J
London Construction Industry Research and Information Association, 1994

A guide to safe working practices for contaminated sites prepared under contract to CIRIA by WS Atkins Environment J.E. Steeds, E. Shepherd, D.L. Barry
London Construction Industry Research and Information Association, 1993

Methane investigation strategies a report in CIRIA's research programme Methane and associated hazards to construction prepared under contract to CIRIA by WS Atkins Environment
London Construction Industry Research and Information Association, 1993

Protecting development from methane a report in CIRIA's research programme Methane ans associated hazards to construction prepared under contract to CIRIA by Frank Grahan Consulting Engineers Limited G.B. Card
London Construction Industry Research and Information Association, 1993

Sediment management in urban drainage catchments prepared under contract to CIRIA by Binnie & Partners in association with South Bank Universiry David Butler, Peter Clark
London Construction Industry Research and Information Association, 1993

The design of pore pressure control systems in fine soils final report to the Environmental Civil Engineering Committee of the Science and Engineering Research Council W. Powrie, J.K. White and M. Preene, Departnent of Civil Engineering, Qu
London Construction Industry Research and Information Association, 1993

The standard penetration test (SPT) methods and use prepared under contract to CIRIA by the University of Surrey C.R.I. Clayton
London Construction Industry Research and Information Association, 1993

A guide to the control of substances hazardous to health in design and construction prepared under contract to CIRIA by SYPOL Environmental Management Limited
London Construction Industry Research and Information Association, 1992

Methane and associated hazards to construction, phase 1 stage 4 research and information needs prepared under contract to CIRIA by Wardell Armstron, consulting engineers
London Construction Industry Research and Information Association, 1992

Prediction and effects of ground movements caused by tunnelling in soft ground beneath urban areas prepared under contract to CIRIA by Mott, Hay and Anderson, Now Mott MacDonald L.M. Lake, W.J. Rankin, J. Hawley
London Construction Industry Research and Information Association, 1992

Results of the analysis of compressed air records in the Decompression Sickness Central Registry edited by F.M. Jardine and based on the work carried out by A. Evans of the University of Newcastle upon Tyne, originally under contrct to CIRI
London Construction Industry Research and Information Association, 1992

Scope for Control of Urban Runoff
Construction Industry Research and Information Association, 1992

Scope for control of urban runoff, volume 1: overview
Construction Industry Research and Information Association, 1992

Scope for control of urban runoff, volume 4: a review of legislation, procedures, economic and planning issues
Construction Industry Research and Information Association, 1992

Scope for control of urban runoff: volume 2: a review of present methods and practice
Construction Industry Research and Information Association, 1992

The design and construction of sheet-piled cofferdams for temporary works prepared under contract to CIRIA by W.A. Dawson Limited
London Construction Industry Research and Information Association, 1992

CIRIA research project 539 management of gully pots for improved runoff quality
Construction Industry Research and Information Association

Control of pollution from highway drainage discharge
Construction Industry Research and Information Association

Guide to good practice on site
Construction Industry Research and Information Association

Remedial treatment for contaminated land
Construction Industry Research and Information Association

Construction and testing of flat arch bridge models final report C. Melbourne, M. Begimgil, L. Weekes
Bolton Bolton Institute, 1994

A comparison of TIG canning and electron beam sealing as encapsulation techniques for HIP diffusion bonding
The Welding Institute, 1993

A review of mechanical test procedures for adhesively binded joints
The Welding Institute, 1993

An application of a simple numerical model for hydrogen diffusion in multipass submerged arc welds in C-Mn steels
The Welding Institute, 1993

High stress abrasive wear testing of chromium boride/ stainless steel and tungsten-vanadium-carbide/stainless steel hard-facing materials
The Welding Institute, 1993

Investigation of various processes for the deposiion of chromium boride/stainless steel hard-facing
The Welding Institute, 1993

Laser welding of laser cut edges produced by high pressure inert assist gas techniques
The Welding Institute, 1993

Microstructural development in low oxygen weld metal
The Welding Institute, 1993

The application of the 'local approach' to cleavage fracture of ferritic steels and their weldments- a review
The Welding Institute, 1993

The effect of direct fluxing on steel root weld metal profile
The Welding Institute, 1993

The influence of aluminium and oxygen on the microstructure of hot wire TIG weld for C-Mn steel
The Welding Institute, 1993

The influence of plasma control gases on laser weld quality in C-Mn steel
The Welding Institute, 1993

Ultrasonuc and radiographic NDT of butt fusion joints in polyethylene
The Welding Institute, 1993

A comendium of toughness requirements for ferritic materials in various international application codes
The Welding Institute, 1992

Effect of welding variables on the pitting resistance of autogenous welds in UNS S31254 high alloy austenitic stainless steel
The Welding Institute, 1992

Effects of spray particle characteristics on coating quality in arc spraying - a review
The Welding Institute, 1992

Fatigue tests in two types of joint to establish joint classification
The Welding Institute, 1992

Residual stresses in crack starter sections of double tension crack arrest specimens - preliminary results
The Welding Institute, 1992

Study of through thickness properties of steel for bridge construction: final report
The Welding Institute, 1991

The fatigue performance of adhesively bonded joints - a review
The Welding Institute, 1991

FATIGUECALC - a microcomputer program for fatigue design of welded joints - description and application in design for variable amplitude loading
The Welding Institute, 1990

Fatigue of welded joints under complex loading: testmethods and preliminary results
The Welding Institute, 1990

Fatigue of welded joints under random loading
The Welding Institute, 1990

Midland links motorways - procedure trials for installation of web stiffeners
The Welding Institute, 1990

Study of through thickness properties of steel for bridge construction
The Welding Institute, 1990

Study of through thickness roperties of steel plate - draft report on experimental work
The Welding Institute, 1990

The application of fatigue design rules to large welded structures
The Welding Institute, 1990

The application of fatigue design rules to large welded structures
The Welding Institute, 1990

Fatigue of welded joints under random loading
The Welding Institute, 1989

Influence of weld toe treatment by grinding and plasma dressing under variable amplitude loading
The Welding Institute, 1989

Investigation into corrosion of stainless steel reinforcement straps
The Welding Institute, 1989

Study of through thickness properties of steel plate (phase 1): review of literature on lamellar tearing in steel construction
The Welding Institute, 1989

The application of fatigue design rules to large welded structures
The Welding Institute, 1989

The influence of geometrical factors on the fatigue strength of fillet welded joints: final report B: longitudinal edge attachments
The Welding Institute, 1989

The influence of geometrical variables in the fatigue strength of fillet welded joints: final report A: traverse welds
The Welding Institute, 1989

The influence of geometrical variables on the fatigue strength of fillet welded joints: final report A: transverse welds
The Welding Institute, 1989

The influence of stress magnitude on the fatigue strength of fillet welds under wide band loading
The Welding Institute, 1989

Fatigue tests on fillet welded joints in steel under simulated wide band type loading
The Welding Institute, 1988

The fatigue strength of peened fillet welds under variable amplitude loading
The Welding Institute, 1988

Improving the fatigue strength og welded joints by peening - techniques and benefits
The Welding Institute, 1987

Re-analysis of constant amplitude fatigue test results for welded joints
The Welding Institute, 1987

Review of work carried out for TRRL during (approximately) the last fifteen years
The Welding Institute, 1987

The effect of misalignment on the fatigue strength of welded cruciform joints
The Welding Institute, 1987

The influence of spectrum shape on culnlative damage of plates with fillet welded edge attachments
The Welding Institute, 1987

Final contract report: analysis of BS5400 fracture toughness requirements
The Welding Institute, 1986

Final contract report: further fatigue tests on transverse ono-load-carrying fillet welded joints in bending
The Welding Institute, 1986

Final contract report: summary of variable apmlitude fatigue data for welded joints
The Welding Institute, 1986

Fatigue tests on fillet welded joints under variable amplitude loading
The Welding Institute, 1985

The fatigue strength of welded joints in thick plates
The Welding Institute, 1984

Contract progress report: fatigue of fillet welds with toe defects
The Welding Institute, 1983

Contract progress report: fatigue of loaded welded joints under simulated highway bridge traffic loading
The Welding Institute, 1983

Contract progress report: improving the fatigue strength of welded joints by grinding - technique and benefits
The Welding Institute, 1983

Contract progress report: improving the fatigue strength of welded joints by grinding - techniques and benefits
The Welding Institute, 1983

Final Contract Report: Influence of joint geometry on the fatigue strength of some fillet welded joints
The Welding Institute, 1983

Final Contract Report: numerical study of geometrical effects in longitudinal non-load-carrying fillet welded joints
The Welding Institute, 1983

Final contract report fatigue tests under variable amplitude loading
The Welding Institute, 1983

Final contract report the influence of stress concentrations on the fatigue strength of welded joints
The Welding Institute, 1983

Final contract report: control of fatigue cracks by hole drilling and bolting or straining
The Welding Institute, 1983

Final contract report: control of fatigue cracks by hole drilling and bolting or straining
The Welding Institute, 1983

Final contract report: fatigue of fillet welded joints under simulated highway bridge traffic loading
The Welding Institute, 1983

Final contract report: fatigue of fillet welds with toe defects
The Welding Institute, 1983

Final contract report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1983

Final contract report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1983

Final contract report: fatigue tests on fillet welded joints in bending
The Welding Institute, 1983

Final contract report: fatigue tests on fillet welded joints in bending
The Welding Institute, 1983

Final contract report: numerical study of geometrical effects in fatigue test specimens
The Welding Institute, 1983

Final contract report: the influence of stress concentrations on the fatigue strength of welded joints
The Welding Institute, 1983

Final contract report; fatigue tests under varied amplitude loading
The Welding Institute, 1983

Final contract reportinfluence of joint geometry on the fatigue strength of some fillet welded joints
The Welding Institute, 1983

Final contract report: M4 Motorway - Boston Manor Vaiduct execution and monitoring of remedial works to cross-girders' in 1979 and 1980
The Welding Institute, 1982

Contract progress report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1981

Investigation of factors which affect the fatigue strength of shot peened fillet welded joints
The Welding Institute, 1981

Final contract report: control of fatigue cracksby hole drilling, (phase II)
The Welding Institute, 1980

Final contract report: further variable amplitude fatigue tests on fillet welded joints
The Welding Institute, 1980

Final contract report: influence of the length annd width of attachments on fatigue strength of welded joints
The Welding Institute, 1980

Final contract report: long fillet welds in shear
The Welding Institute, 1980

Final contract report: an assessment of techniques for the repair of bridge deck longitudinal welds
The Welding Institute, 1979

Final contract report: fatigue of partial penetration trough stiffener to deck plate welds
The Welding Institute, 1979

Final contract report: variable amplitude fatigue tests on welded joints
The Welding Institute, 1979

Control of fatigue cracks by hole drilling
The Welding Institute, 1978

Fatigue strength of repair welds in a trough to deck plate joint
The Welding Institute, 1978

Final contract report: assessment of techniques for the repair of steel bridge decks - part 3 - full-scale repair tests
The Welding Institute, 1978

Final contract report: fatigue of butt welds made on backing bars
The Welding Institute, 1978

Further fatigue tests on welded joints under compressive loading: final report
The Welding Institute, 1978

Variable amplitude fatigue tests on welded joints
The Welding Institute, 1978

Control of fatigue cracks by hole drilling
The Welding Institute, 1977

Fatigue strength of butt welds between plates of different thicknesses: experimental work
The Welding Institute, 1976

Fatigue tests relevant to box girder bridges part 2: fatigue tests on conditinuous welds under shear loading Final report
The Welding Institute, 1976

Removal and repair of fatigue cracks
The Welding Institute, 1976

Repair and remedy of fatigue cracks evaluation of remedial repair techniques
The Welding Institute, 1976

Repair and remedy of fatigue cracks evaluation of standard repair techniques
The Welding Institute, 1976

Cumulative damage calculations taking account of low stresses in the spectrum
The Welding Institute, 1975

Fatigue tests on possible bridge deck repair welds
The Welding Institute, 1975

The welding of reinforcing bars
The Welding Institute, 1975

The welding of reinforceing bars
The Welding Institute, 1974

Proposed fatigue design stresses for weld metal
The Welding Institute, 1973

Re-analysis of fatigue data for welded joints in steel cumulative damage summation for Highway Loading Spectra
The Welding Institute, 1971

Brittle fracture tests on as-rolled sections to B.S. 4360: 1968, grade 50 (replacing B.S. 968: 1962)
The Welding Institute, 1969

The impact of highway drainage on groundwater control
Jackson Environment Institute, 1999

Ecology and Twyford Down
Institute of Terrestrial Ecology, 1997

Manual of British water engineering practice: volume III water quality and treatment
Institute of Water Engineers, 1969

Manual of British water engineering practice: volume 1 organization and management
Institute of Water Engineers, 1969

Structural monitoring of Monk Bridge on A59 Lancashire C. Melbourne
Bolton Bolton Institute of Higher Education, 1993

Monitoring of a two span masonry arch structure under the action of A C & U vehicle and an abnormally heavy load Egremont Bridge, trunk road A595 C. Melbourne
Bolton Bolton Institute of Higher Education, 1990

The behaviour of semi-circular brickwork masonry arch bridge models C. Melbourne
Bolton Bolton Institute of Higher Education, 1990

Load test to collapse of a full-scale brickwork masonry arch C. Melbourne and P.J. Walker
Bolton Bolton Institute of Higher Education, 1989

An exploratory study of urban runoff toxicity
National Water Research Institute

Road 94: general technical construction specifications for roads, chapter 8 dewatering and drainage
Swedish National Road Administration, 1994

A review of European and United States road construction and maintenance practice
Transport and Road Research Laboratory, 1992

Background paper on cement replacement materials
Transport and Road Research Laboratory, 1992

Improved methods of structural examination for the design of pavement strengthening
Transport and Road Research Laboratory, 1992

Injury accidents on rural single-carriageway roads: extended analysis and recommendations
Transport and Road Research Laboratory, 1992

Latest developments in surface dressing techniques and equipment
Transport and Road Research Laboratory, 1992

Latest developments in surface dressing techniques and equipment
Transport and Road Research Laboratory, 1992

Non-destructive testing methods of assessing compliance with performance specification
Transport and Road Research Laboratory, 1992

Outline proposal for a new accelerated polishing test
Transport and Road Research Laboratory, 1992

Performance of overlays to inhibit reflective cracking
Transport and Road Research Laboratory, 1992

Rapid determination of bitumen content of bituminous materials by neutron absorption
Transport and Road Research Laboratory, 1992

Surface impregnanats for concrete bridges
Transport and Road Research Laboratory, 1992

The assessment and load test to failure of a filler beam bridge deck
Transport and Road Research Laboratory, 1992

The effect of delaying structural maintenance
Transport and Road Research Laboratory, 1992

The role of field measurements in the design and construction of geotechnical structures
Transport and Road Research Laboratory, 1992

A gravel sub-base specification trial on the A140 Dickleburgh Bypass
Transport and Road Research Laboratory, 1991

A laboratory investigation into the effect of loading on the undulatory extinction of quartz
Transport and Road Research Laboratory, 1991

A method for the design of concrete overlays
Transport and Road Research Laboratory, 1991

A note on cycle accidents and theeconomics of cycle facility provision at roundabouts
Transport and Road Research Laboratory, 1991

A review of further research needs on macrotexture
Transport and Road Research Laboratory, 1991

Ageing of Chemcrete-modified wearing courses
Transport and Road Research Laboratory, 1991

Assessment of three leak detection methods for bridge deck waterproofing systems in-service
Transport and Road Research Laboratory, 1991

Broadening the specification of granular fills
Transport and Road Research Laboratory, 1991

Concrete repair: criteria for concrete removal
Transport and Road Research Laboratory, 1991

Continuously reinforced concrete pavements (CRCP): a survey of maintenance treatments and repairs
Transport and Road Research Laboratory, 1991

Effect of design life on the whole life costs of flexible pavements
Transport and Road Research Laboratory, 1991

Effect of traffic realignment on pavement wear
Transport and Road Research Laboratory, 1991

Geometric requirements for safer single carriageways: identification of sites and variables
Transport and Road Research Laboratory, 1991

Injury accidents on rural single-carriageway roads
Transport and Road Research Laboratory, 1991

Laboratory tests on Asphapol 2000 modified rolled asphalt
Transport and Road Research Laboratory, 1991

Quality assured bituminous materials
Transport and Road Research Laboratory, 1991

Relative pavement wear effects of different wheel types and tyre pressures
Transport and Road Research Laboratory, 1991

Removng detritus from pervious macadam by mechancal means
Transport and Road Research Laboratory, 1991

Review of systems for monitoring road surface cracks at high-speed
Transport and Road Research Laboratory, 1991

Road works warnign system: results of IR sensor trials
Transport and Road Research Laboratory, 1991

Some aspects of the material specification and the acoustic absorption properties of porous road surfaces
Transport and Road Research Laboratory, 1991

Specification trials of Novophalt-modified wearing courses
Transport and Road Research Laboratory, 1991

Surface dressing survey 1988: part 3 visual condition assessments after 3 years
Transport and Road Research Laboratory, 1991

The absorption of water by concrete: cyclic wetting
Transport and Road Research Laboratory, 1991

The effect of compositional variations of hot rooled asphalt wearing course on laboratory performance
Transport and Road Research Laboratory, 1991

The effect of surface dressing on the structural behaviour of road pavements
Transport and Road Research Laboratory, 1991

The effects of 10 tonne and 11.5 tonne axle loads on pavement wear
Transport and Road Research Laboratory, 1991

The potential of laboratory tests for specifying end product requirements of hot rolled asphalt wearing courses
Transport and Road Research Laboratory, 1991

Traffic, transportand driver information systems in Japan
Transport and Road Research Laboratory, 1991

Trends in vehicle wear factors 1975 to 1990
Transport and Road Research Laboratory, 1991

Trials with DBM roadbase with modified binders: laying, analysis and initial test results
Transport and Road Research Laboratory, 1991

Trials with DBM roadbase with modified binders: laying,analysis and initial test results
Transport and Road Research Laboratory, 1991

Use of nuclear density gauages on pavement quality concrete
Transport and Road Research Laboratory, 1991

A method of determining the polished stone value of pre-coated chipping
Transport and Road Research Laboratory, 1990

A relation between the aggregate abrasion test and the Micro-Deval Test
Transport and Road Research Laboratory, 1990

Alignment aid for the high-speed road monitor
Transport and Road Research Laboratory, 1990

Comparative performance tests on dense bitumen macadam and heavy duty macadam
Transport and Road Research Laboratory, 1990

Construction of a trial on A30 Bodmin Bypass to investigate ways of minimising reflection cracking in a new overlay
Transport and Road Research Laboratory, 1990

Continuously reinforced concrete pavements (CRCP): survey to study effect of design variables on cracking
Transport and Road Research Laboratory, 1990

Design sensitivity to errors in data
Transport and Road Research Laboratory, 1990

Dynamic loading and pavement wear
Transport and Road Research Laboratory, 1990

Evaluation 0f TRRL's residual life network model
Transport and Road Research Laboratory, 1990

Evaluation of tenders for new roads using the TRRL whole life cost model
Transport and Road Research Laboratory, 1990

Fast track concrete paving: a desk-top study
Transport and Road Research Laboratory, 1990

Fast track concrete paving: construction of a full-scale trial at Kettering
Transport and Road Research Laboratory, 1990

Laboratory assessment of the dowel bar locator
Transport and Road Research Laboratory, 1990

Laying and compaction of rolled asphalt: probability of adverse weather conditions
Transport and Road Research Laboratory, 1990

Marshall Asphalt and Friction Course: adverse weather working
Transport and Road Research Laboratory, 1990

Performance of road maintenance treatments
Transport and Road Research Laboratory, 1990

Performance trials on trench reinstatement: Wickford, Essex
Transport and Road Research Laboratory, 1990

Petrographical analysis of an Oxfordshire sand
Transport and Road Research Laboratory, 1990

Petrographical analysis of morainic sand used in Ralumac surfacing
Transport and Road Research Laboratory, 1990

Proposed revision of road note 39: first draft
Transport and Road Research Laboratory, 1990

Requirements of laboratory design and field assessment tests for pavement foundations
Transport and Road Research Laboratory, 1990

Review of methods of evaluating the structural integrity of pavements
Transport and Road Research Laboratory, 1990

Review of waterproofing failures on concrete bridge decks
Transport and Road Research Laboratory, 1990

Surface dressing survey 1988: part 1 empirical and simulative test methods and results
Transport and Road Research Laboratory, 1990

Surface dressing survey 1988: part 2 road site and visual assessments
Transport and Road Research Laboratory, 1990

The Department of Transport procedure for evaluating new materials: the assessment of Asphapol 2000
Transport and Road Research Laboratory, 1990

The absorption of water by concrete: the state of the art
Transport and Road Research Laboratory, 1990

The performance of joint sealants in concrete carriageways: an interim report
Transport and Road Research Laboratory, 1990

The performance of maintenance treatments on concrete roads
Transport and Road Research Laboratory, 1990

The use of CRISP for soil-structure intergration analysis
Transport and Road Research Laboratory, 1990

The workability of bitumanous mixes: assessment of test methods
Transport and Road Research Laboratory, 1990

Winter maintenance of pervious macadam
Transport and Road Research Laboratory, 1990

A guide to masonary arch bridges
Transport and Road Research Laboratory, 1989

A study of trench reinstatement using an Ingersoll-Rand RX75 75 KG Vibro-Tamper
Transport and Road Research Laboratory, 1989

Amendment to pavement design standards: estimation of traffic
Transport and Road Research Laboratory, 1989

An investigation of chemcrete U1-49 in a low-stability hot rolled asphalt
Transport and Road Research Laboratory, 1989

Assesment of the indirect tensile test for the design of bituminous roadbase materials
Transport and Road Research Laboratory, 1989

Assessment of bituminous roads: experience with advice note HA30/85
Transport and Road Research Laboratory, 1989

Chemcrete wearing course trial on M6 Staffordshire 1985: results over 4 years
Transport and Road Research Laboratory, 1989

Continuously reinforced concrete pavement: theoretical modelling of crack patterns
Transport and Road Research Laboratory, 1989

Effectiveness of repairs to reinforcement corrosion in a motorway viaduct
Transport and Road Research Laboratory, 1989

HGV numbers and road wear: impact of proposed EC weight limits (1992)
Transport and Road Research Laboratory, 1989

Interim classification plant for use in trench reinstatement
Transport and Road Research Laboratory, 1989

Load test to collapse on an arch bridge at Barlae, Dumfries and Galloway Region
Transport and Road Research Laboratory, 1989

Load test to collapse on an arch bridge at Strathmashie, Highland region
Transport and Road Research Laboratory, 1989

Measurement of prestress on a 28 year old post-tensioned concrete bridge beam
Transport and Road Research Laboratory, 1989

Measurements of vibrations in trial reinforced earth structures and beneath a railway
Transport and Road Research Laboratory, 1989

Methods of assessing road foundations: pilot-scale trials
Transport and Road Research Laboratory, 1989

Peel Green bridge: tests on side-span beams
Transport and Road Research Laboratory, 1989

Piezometer reading during installation of a diaphragm wall founded in London clay
Transport and Road Research Laboratory, 1989

Preliminary comparisons of TRRL full scale arch bridge load tests with mexe assessments
Transport and Road Research Laboratory, 1989

Properties of soils in TRRL's pilot-scale facilities
Transport and Road Research Laboratory, 1989

Proposed certification test requirements for waterproofing systems on concrete bridge decks
Transport and Road Research Laboratory, 1989

Quality assurance and NAMAS accreditation
Transport and Road Research Laboratory, 1989

Reflective cracking in composite pavements
Transport and Road Research Laboratory, 1989

Reinforced soil in areas of mining subsidence
Transport and Road Research Laboratory, 1989

Residual life of bituminous pavement layers
Transport and Road Research Laboratory, 1989

Road skidding resistance and surface noise - a background note
Transport and Road Research Laboratory, 1989

Severn Crossing: data from long term monitoring
Transport and Road Research Laboratory, 1989

Severn Crossing: fatigue assessment of the web of box to deckplate joint on the Wye Bridge
Transport and Road Research Laboratory, 1989

Severn crossing: long trem monitoring of stresses in the deck
Transport and Road Research Laboratory, 1989

TRRL wholelife cost model for flexible and rigid pavements
Transport and Road Research Laboratory, 1989

Temperature distributions in reinforced soil retaining walls
Transport and Road Research Laboratory, 1989

Tests on half-scale model concrete bridges: strength calculations for prestressed beam and slab deck
Transport and Road Research Laboratory, 1989

The compaction of soil for trench reinstatement using a vibro-tamper
Transport and Road Research Laboratory, 1989

The nuclear method of measureing the density and moisture content of compacted soil
Transport and Road Research Laboratory, 1989

The nuclear method of measuring the density and moisture content of compacted soil
Transport and Road Research Laboratory, 1989

The performance of terminations to continuously reinforced concrete pavements
Transport and Road Research Laboratory, 1989

The performance of terminations to continuously reinforced concrete pavements
Transport and Road Research Laboratory, 1989

Topic for review of concrete bridge assessment code.
Transport and Road Research Laboratory, 1989

Winter maintenance: review of current research and practice
Transport and Road Research Laboratory, 1989

Ynysygwas Bridge load test to failure on the upstream edge beam
Transport and Road Research Laboratory, 1989

assessment of the indirect tensile test for the design of bituminous roadbase materials
Transport and Road Research Laboratory, 1989

A network maintennance model based on residual life
Transport and Road Research Laboratory, 1988

Effect of subgrade modulus of trench backfill on compaction of a superimposed layer
Transport and Road Research Laboratory, 1988

Fatigue tests on glass reinforced cement permanent formwork panels
Transport and Road Research Laboratory, 1988

Long term performance of an embeded retaining wall in stiff clay
Transport and Road Research Laboratory, 1988

Research needs in road aggregates for the decade ahead
Transport and Road Research Laboratory, 1988

Road trials of ashalt substitution - interim report
Transport and Road Research Laboratory, 1988

Severn Crossing: fatigue tests on cables in bending
Transport and Road Research Laboratory, 1988

Soil anchors, nails and reinforced systems
Transport and Road Research Laboratory, 1988

The classification of waterproofing systems for concrete bridge decks
Transport and Road Research Laboratory, 1988

The swelling behaviour of clay fill
Transport and Road Research Laboratory, 1988

Trial to assess treatments for reflective cracking in a lean concrete road
Transport and Road Research Laboratory, 1988

Calculation of the charecteristic UDL for bridges
Transport and Road Research Laboratory, 1987

Current practice in England for the optimum allocation of road funds for maintenance and rehabilitation programmes
Transport and Road Research Laboratory, 1987

Predicted delays at contra-flow roadworks on motorways 1986-1996
Transport and Road Research Laboratory, 1987

Revised criteria for TCB post installation testing
Transport and Road Research Laboratory, 1987

Severn Bridge - development of a repair method for cracked deck stiffeners
Transport and Road Research Laboratory, 1987

Severn Crossing: fatigue tests on a deck panel
Transport and Road Research Laboratory, 1987

Severn Crossing: final report on strengthening the stiffener to crossbeam joint
Transport and Road Research Laboratory, 1987

Some examples of the research of ground engineering division
Transport and Road Research Laboratory, 1987

The capacity of major/minor priority junctions on high-speed roads
Transport and Road Research Laboratory, 1987

Corrosion of reinforcement in CRCP on M180
Transport and Road Research Laboratory, 1986

Costs of maintaince operations
Transport and Road Research Laboratory, 1986

Estimating the damaging power of traffic from classified vehicle counts
Transport and Road Research Laboratory, 1986

Load test to collapse on a brick arch bridge at Prestwood, West Midlands
Transport and Road Research Laboratory, 1986

Load test to collapse on a masonary arch bridge at Preston-Upon-The-Wealdmoors, Shropshire
Transport and Road Research Laboratory, 1986

Prediction of rates of fatigue cracking in wetlded details on the decks of the Seven and Wye bridge
Transport and Road Research Laboratory, 1986

Whole life costs of concrete pavements
Transport and Road Research Laboratory, 1986

Whole life costs of concrete pavements
Transport and Road Research Laboratory, 1986

A computer program for fatigue assessment
Transport and Road Research Laboratory, 1985

A model for calculating the capacity of a flared minor road at major/minor priority junctions
Transport and Road Research Laboratory, 1985

A study of the performance and reflective cracking of roads with cement-bound roadbase
Transport and Road Research Laboratory, 1985

The blocking of major road through traffic by right-turners at a major/minor junction-the calculation of capacities, queues and delays
Transport and Road Research Laboratory, 1985

A comparison of analytical methods for the design of bituminous road pavements
Transport and Road Research Laboratory, 1984

Chlorides in concrete and in-situ non-destructive testing
Transport and Road Research Laboratory, 1984

The influence of wheelpath distribution on pavement life
Transport and Road Research Laboratory, 1984

Accuracy requirements for weighbridges
Transport and Road Research Laboratory, 1983

Energy in road construction
Transport and Road Research Laboratory, 1983

Pulverised-fuel ash in concrete pavements: road experiment on M54, Shifnal
Transport and Road Research Laboratory, 1983

An assessment of the conditions for shrubs alongside motorways
Transport and Road Research Laboratory, 1982

A comparison of methods for measuring atmospheric corrosion rates
Transport and Road Research Laboratory, 1981

Limit state design in geotechnical engineering
Transport and Road Research Laboratory, 1981

Concrete cover to reinforcement in highway bridges: a pilot study comparison of cover before and after concrete placement
Transport and Road Research Laboratory, 1978

The depth of cover to steel reinforcement in highway bridges
Transport and Road Research Laboratory, 1977

Laboratory studies of the penetration of sand by bentonite slurry
Transport and Road Research Laboratory, 1976

Instrumented drilling trials at Chinnor
Transport and Road Research Laboratory, 1975

Ground quality assessment: channel tunnel machine erection chamber - October 1974
Transport and Road Research Laboratory, 1974

Speed/flow relations in the passenger tunnel at Heathrow Airport
Transport and Road Research Laboratory, 1973

In-situ recycling: a trial to compare resurfacing techniques using a modified repaver
Transport and Road Research Laboratory

The assessment of multi-span masonry arch bridges
Transport and Road Research Laboratory