Highways Agency Reports
Report Data
Shelfmark | SSR/TRL/IN1 |
---|---|
Author | Hudson J A |
Title | Ground quality assessment: channel tunnel machine erection chamber - October 1974 |
Publisher | Transport and Road Research Laboratory, 1974 |
Physical Description | 7p., charts |
Series | TRRL Internal Note IN 0053/74 |
Notes | Abstract: Measurements showed that the fac indexing system developed at the tunnelling trials at Chinnor could be used satisfactorily under the different conditions and in the different chalk of the chalk was found to be 6.7 MN/m2 (970 psi). The average discontinuity spacing was 0.33 m, and most of the discontinuities were sub-parallel to the tunnel axis indicating that they have resulted from the excavation process - either by stress changes of weathering effects. |
Keywords | Land Analysis Land Use |
1 Copy
TRRL INTERNAL NOTE
Copy ID: 54046000301257,
Library: SSR,
Location: SSR-SHELF
This information is provided for reference only. BridgeForum does not have copies of these reports.