Highways Agency Contract Reports
By keyword
55 Reports with keyword 'Material Fatigue':
Brittle fracture tests on as-rolled sections to B.S. 4360: 1968, grade 50 (replacing B.S. 968: 1962)
The Welding Institute, 1969
Contract progress report: fatigue of fillet welds with toe defects
The Welding Institute, 1983
Contract progress report: fatigue of loaded welded joints under simulated highway bridge traffic loading
The Welding Institute, 1983
Contract progress report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1981
Contract progress report: improving the fatigue strength of welded joints by grinding - techniques and benefits
The Welding Institute, 1983
Contract progress report: improving the fatigue strength of welded joints by grinding - technique and benefits
The Welding Institute, 1983
Control of fatigue cracks by hole drilling
The Welding Institute, 1977
Control of fatigue cracks by hole drilling
The Welding Institute, 1978
Cumulative damage calculations taking account of low stresses in the spectrum
The Welding Institute, 1975
Fatigue of welded joints under random loading
The Welding Institute, 1989
Fatigue strength of butt welds between plates of different thicknesses: experimental work
The Welding Institute, 1976
Fatigue strength of repair welds in a trough to deck plate joint
The Welding Institute, 1978
Fatigue tests on possible bridge deck repair welds
The Welding Institute, 1975
Fatigue tests relevant to box girder bridges part 2: fatigue tests on conditinuous welds under shear loading Final report
The Welding Institute, 1976
Final contract report: analysis of BS5400 fracture toughness requirements
The Welding Institute, 1986
Final contract report: control of fatigue cracks by hole drilling and bolting or straining
The Welding Institute, 1983
Final contract report: control of fatigue cracks by hole drilling and bolting or straining
The Welding Institute, 1983
Final contract report: control of fatigue cracksby hole drilling, (phase II)
The Welding Institute, 1980
Final contract report: fatigue of butt welds made on backing bars
The Welding Institute, 1978
Final contract report: fatigue of fillet welded joints under simulated highway bridge traffic loading
The Welding Institute, 1983
Final contract report: fatigue of fillet welds with toe defects
The Welding Institute, 1983
Final contract report: fatigue of partial penetration trough stiffener to deck plate welds
The Welding Institute, 1979
Final contract report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1983
Final contract report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1983
Final contract report: fatigue tests on fillet welded joints in bending
The Welding Institute, 1983
Final contract report: fatigue tests on fillet welded joints in bending
The Welding Institute, 1983
Final contract report fatigue tests under variable amplitude loading
The Welding Institute, 1983
Final contract report; fatigue tests under varied amplitude loading
The Welding Institute, 1983
Final contract report: further fatigue tests on transverse ono-load-carrying fillet welded joints in bending
The Welding Institute, 1986
Final contract report: further variable amplitude fatigue tests on fillet welded joints
The Welding Institute, 1980
Final Contract Report: Influence of joint geometry on the fatigue strength of some fillet welded joints
The Welding Institute, 1983
Final contract report: influence of the length annd width of attachments on fatigue strength of welded joints
The Welding Institute, 1980
Final Contract Report: numerical study of geometrical effects in longitudinal non-load-carrying fillet welded joints
The Welding Institute, 1983
Final contract report: numerical study of geometrical effects in fatigue test specimens
The Welding Institute, 1983
Final contract report: summary of variable apmlitude fatigue data for welded joints
The Welding Institute, 1986
Final contract report the influence of stress concentrations on the fatigue strength of welded joints
The Welding Institute, 1983
Final contract report: the influence of stress concentrations on the fatigue strength of welded joints
The Welding Institute, 1983
Final contract report: variable amplitude fatigue tests on welded joints
The Welding Institute, 1979
Final contract reportinfluence of joint geometry on the fatigue strength of some fillet welded joints
The Welding Institute, 1983
Further fatigue tests on welded joints under compressive loading: final report
The Welding Institute, 1978
Improving the fatigue strength og welded joints by peening - techniques and benefits
The Welding Institute, 1987
Investigation into corrosion of stainless steel reinforcement straps
The Welding Institute, 1989
Proposed fatigue design stresses for weld metal
The Welding Institute, 1973
Re-analysis of constant amplitude fatigue test results for welded joints
The Welding Institute, 1987
Re-analysis of fatigue data for welded joints in steel cumulative damage summation for Highway Loading Spectra
The Welding Institute, 1971
Removal and repair of fatigue cracks
The Welding Institute, 1976
Repair and remedy of fatigue cracks evaluation of remedial repair techniques
The Welding Institute, 1976
Repair and remedy of fatigue cracks evaluation of standard repair techniques
The Welding Institute, 1976
Review of work carried out for TRRL during (approximately) the last fifteen years
The Welding Institute, 1987
The application of fatigue design rules to large welded structures
The Welding Institute, 1990
The application of fatigue design rules to large welded structures
The Welding Institute, 1990
The application of fatigue design rules to large welded structures
The Welding Institute, 1989
The fatigue strength of peened fillet welds under variable amplitude loading
The Welding Institute, 1988
The influence of stress magnitude on the fatigue strength of fillet welds under wide band loading
The Welding Institute, 1989
Variable amplitude fatigue tests on welded joints
The Welding Institute, 1978