55 Reports with keyword 'Material Fatigue':

Brittle fracture tests on as-rolled sections to B.S. 4360: 1968, grade 50 (replacing B.S. 968: 1962)
The Welding Institute, 1969

Contract progress report: fatigue of fillet welds with toe defects
The Welding Institute, 1983

Contract progress report: fatigue of loaded welded joints under simulated highway bridge traffic loading
The Welding Institute, 1983

Contract progress report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1981

Contract progress report: improving the fatigue strength of welded joints by grinding - techniques and benefits
The Welding Institute, 1983

Contract progress report: improving the fatigue strength of welded joints by grinding - technique and benefits
The Welding Institute, 1983

Control of fatigue cracks by hole drilling
The Welding Institute, 1977

Control of fatigue cracks by hole drilling
The Welding Institute, 1978

Cumulative damage calculations taking account of low stresses in the spectrum
The Welding Institute, 1975

Fatigue of welded joints under random loading
The Welding Institute, 1989

Fatigue strength of butt welds between plates of different thicknesses: experimental work
The Welding Institute, 1976

Fatigue strength of repair welds in a trough to deck plate joint
The Welding Institute, 1978

Fatigue tests on possible bridge deck repair welds
The Welding Institute, 1975

Fatigue tests relevant to box girder bridges part 2: fatigue tests on conditinuous welds under shear loading Final report
The Welding Institute, 1976

Final contract report: analysis of BS5400 fracture toughness requirements
The Welding Institute, 1986

Final contract report: control of fatigue cracks by hole drilling and bolting or straining
The Welding Institute, 1983

Final contract report: control of fatigue cracks by hole drilling and bolting or straining
The Welding Institute, 1983

Final contract report: control of fatigue cracksby hole drilling, (phase II)
The Welding Institute, 1980

Final contract report: fatigue of butt welds made on backing bars
The Welding Institute, 1978

Final contract report: fatigue of fillet welded joints under simulated highway bridge traffic loading
The Welding Institute, 1983

Final contract report: fatigue of fillet welds with toe defects
The Welding Institute, 1983

Final contract report: fatigue of partial penetration trough stiffener to deck plate welds
The Welding Institute, 1979

Final contract report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1983

Final contract report: fatigue of transverse butt welds made on backing bars
The Welding Institute, 1983

Final contract report: fatigue tests on fillet welded joints in bending
The Welding Institute, 1983

Final contract report: fatigue tests on fillet welded joints in bending
The Welding Institute, 1983

Final contract report fatigue tests under variable amplitude loading
The Welding Institute, 1983

Final contract report; fatigue tests under varied amplitude loading
The Welding Institute, 1983

Final contract report: further fatigue tests on transverse ono-load-carrying fillet welded joints in bending
The Welding Institute, 1986

Final contract report: further variable amplitude fatigue tests on fillet welded joints
The Welding Institute, 1980

Final Contract Report: Influence of joint geometry on the fatigue strength of some fillet welded joints
The Welding Institute, 1983

Final contract report: influence of the length annd width of attachments on fatigue strength of welded joints
The Welding Institute, 1980

Final Contract Report: numerical study of geometrical effects in longitudinal non-load-carrying fillet welded joints
The Welding Institute, 1983

Final contract report: numerical study of geometrical effects in fatigue test specimens
The Welding Institute, 1983

Final contract report: summary of variable apmlitude fatigue data for welded joints
The Welding Institute, 1986

Final contract report the influence of stress concentrations on the fatigue strength of welded joints
The Welding Institute, 1983

Final contract report: the influence of stress concentrations on the fatigue strength of welded joints
The Welding Institute, 1983

Final contract report: variable amplitude fatigue tests on welded joints
The Welding Institute, 1979

Final contract reportinfluence of joint geometry on the fatigue strength of some fillet welded joints
The Welding Institute, 1983

Further fatigue tests on welded joints under compressive loading: final report
The Welding Institute, 1978

Improving the fatigue strength og welded joints by peening - techniques and benefits
The Welding Institute, 1987

Investigation into corrosion of stainless steel reinforcement straps
The Welding Institute, 1989

Proposed fatigue design stresses for weld metal
The Welding Institute, 1973

Re-analysis of constant amplitude fatigue test results for welded joints
The Welding Institute, 1987

Re-analysis of fatigue data for welded joints in steel cumulative damage summation for Highway Loading Spectra
The Welding Institute, 1971

Removal and repair of fatigue cracks
The Welding Institute, 1976

Repair and remedy of fatigue cracks evaluation of remedial repair techniques
The Welding Institute, 1976

Repair and remedy of fatigue cracks evaluation of standard repair techniques
The Welding Institute, 1976

Review of work carried out for TRRL during (approximately) the last fifteen years
The Welding Institute, 1987

The application of fatigue design rules to large welded structures
The Welding Institute, 1990

The application of fatigue design rules to large welded structures
The Welding Institute, 1990

The application of fatigue design rules to large welded structures
The Welding Institute, 1989

The fatigue strength of peened fillet welds under variable amplitude loading
The Welding Institute, 1988

The influence of stress magnitude on the fatigue strength of fillet welds under wide band loading
The Welding Institute, 1989

Variable amplitude fatigue tests on welded joints
The Welding Institute, 1978