Highways Agency Reports
Report Data
Shelfmark | SSR/PAR/1 |
---|---|
Corporate Author | Parkman |
Title | Interim report on the introduction of reduced lane widths between M62 junctions 12 and 14 (eastbound) |
Publisher | Parkman, 1992 |
Physical Description | 24 leaves, charts |
Notes | The eastbound carriageway of the M62 motorway between junctions 12 and 14 was remarked in Jume 1991 to provide four narrow lanes. This was undertaken as a trial to increase capacity on this heavily trafficked section of motorway pending widening to four full width lanes. This interim report provides feedback on the first five months of operation of the narrow lanes. |
Keyword | Motorways |
1 Copy
CONTRACTOR REPORT
Copy ID: 54046000282077,
Library: SSR,
Location: SSR-SHELF
This information is provided for reference only. BridgeForum does not have copies of these reports.