Highways Agency Report
Original Record
Shelfmark: SSR/PAR/1
Corporate author: Parkman
Title: Interim report on the introduction of reduced lane
widths between M62 junctions 12 and 14 (eastbound)
Publisher: Parkman, 992
Physical description: 24 leaves, charts
Price: Unpriced
Notes - general: The eastbound carriageway of the M62 motorway between
junctions 12 and 14 was remarked in Jume 1991 to
provide four narrow lanes. This was undertaken as a
trial to increase capacity on this heavily trafficked
section of motorway pending widening to four full
width lanes. This interim report provides feedback on
the first five months of operation of the narrow
lanes.
Keyword: Motorways
CONTRACTOR REPORT
copy:1 id:54046000282077 library:SSR location:SSR-SHELF