21 Reports with keyword 'Viaduct':
A19 Leven Valley viaduct report on procedure trials for repair to soffits of prestressed beams at tendon deflection points
Cleveland County Council, 1992
A19 Tees Viaduct substructure refurbishment report on second phase strategy implementation
Maunsell, 1993
Assesssment of risks associated with the stagecoach supertram line adjacent to Tinsley Viaduct
Design and build assessment A38 Marsh Mills viaduct replacement : final report
Thorburn Colquhoun, 1997
Kirklees Viaduct report on the failure of the fixed bearings
Vol. 1
Frank Graham, 1991
Kirklees Viaduct report on the failure of the fixed bearings
Vol. 2
Frank Graham, 1991
Lawtland House Viaduct investigation into the deterioration of concrete columns
Balfour Beatty Power Construction, 1980
M62 KirkleesViaduct failure of fixed bearings interim report
Frank Graham Consulting Engineers, 1990
Midland links motorway viaduct of assessment of fire damage
Maunsell, 1990
Notes on half joints for A74 Mossband railway viaduct author: Harry Gill
Cumbria County Council, 2000
Principal inspection report for Kirklees Viaduct, DOT no. M62/94.80/1
Frank Graham Consulting Engineers, 1990
Principal inspection report for Tinsley Viaduct
Owen Williams, 2000
Snaith-Sunderland Trunk Road A19 Tees Viaduct, Cleveland
STATS Limited, 1982
Tees Viaduct bearing study
Materials Engineering Research Laboratory Limited, 1989
Tinsley Viaduct : appraisal and if necessary strengthening of piers and bearings
Owen Williams, 2000
Tinsley Viaduct assessment report
Owen Williams, 2000
Tinsley Viaduct independent appraisal of category III assessment 2nd interim report
Flint and Neill Partnership, 1998
Tinsley Viaduct report on department for assessment
Owen Williams, 1999
Tinsley Viaduct report on departures for assessment
Owen Williams, 2000
Tinsley Viaduct report on departures for strengthening
Owen Williams, 2000
Tinsley Viaduct special inspection report for the high strength friction grip bolts
Owen Williams, 2000