A13 Movers Lane junction improvements Landscape Advisory Committee inspection Committee brief Acer Consultants Limited, consultants, Chris Blandford Associates, landscape architecture sub-consultant
Acer Consultants Limited, 1992

The capacity and safety of motorway weaving sections by I. Summersgill, E.J. Hardman and R. Smith
Transport Research Laboratory, 1998

Grade separated junctions with local roads
Phase 2 Recommended standards
Acer Scotland, 1990

Grade separated junctions with local roads
Phase 3 Site analysis
Acer Scotland, 1990

Grade-separated junctions final report by J.R. Peirce and G.T. Wall
Transport Research Laboratory, 1996

Merging trial on the M25/A12 junction by G.T. Wall
Transport Research Laboratory, 1996

Program specification for calculation routines [project: Urban accident routines in PICADY] by M.R. Crabtree
Transport Research Laboratory, 1995

Report on the preparation of design guidance for compact grade separation
Bullen Consultants, 1995

Report on the preparation of design guidance for limited facility grade separation
Bullen Consultants, 1995

SISTM assessment of four merge and four diverge slip road arrangements by R. Smith
Transport Research Laboratory, 1994

SISTM preliminary assessment of single level junctions for link road systems by E.J. Hardman and R. Smith
Transport Research Laboratory, 1993

The capacity of major/minor priority junctions on high-speed roads
Transport and Road Research Laboratory, 1987

The operation and capacity of grade separated junctions (design considerations)
Thorburn Colquhoun, 1996

The "transition" models in PICADY by Janet V. Kennedy
Transport Research Laboratory, 1996

Trial on junctions 12 and 14 of the M25 by G.T. Wall and J.R. Peirce
Transport Research Laboratory, 1996